12bet casino

Lump of 12bet casino Middle blockManlailiang 12bet casino Mine (Ulan Group)

¥455.00 12bet casino /ton 57 kilometers away 12bet casino Baofu Road, Xinmiao, Yiqi

Dealer

Manager Qin 13310346684

Detailed parameters

12bet casino indicator
Calorific value 6000 kcal
12bet casino type Lump of 12bet casino
Granularity Middle block
Moisture 12%-16%
Ash 10%-12%
12bet casino indicator
Sulfur content 0.2%-0.5%
Volatile content 30%-33%
Adhesion index Below 5%
Scorch special effects Below 10%
12bet casino of votes One vote

12bet casino details

Related information

Title 12bet casino type Granularity 12bet casino Calories Price Inventory Operation
Manlailiang 12bet casino Mine (Ulan Group) One clean 12bet casino Faced 12bet casino Ijinholo Flag 5600 kcal 315.0012bet casino 100000 12bet casino 12bet cas
Manlailiang 12bet casino Mine (Ulan Group) Lump of 12bet casino Forty-nine 12bet casino Ijinholo Flag 6000 kcal 455.0012bet casino 100000 12bet casino 12bet ca
Manlailiang 12bet casino Mine (Ulan Group) Lump of 12bet casino Big block Ijinholo Flag 6000 kcal 455.0012bet casino 100000 12bet casino 12bet mob

12bet casino Introduction

Manlailiang 12bet casino Mine (Ulan Group)

Contact 12bet casino : 13904778869 Address: 57 kilometers away 12bet casino Baofu Road, Xinmiao, Yiqi

Manlailiang 12bet casino Mine is located in Nalintaohai Town, Yijinhuoluo Banner, Ordos City。November 2010,The Ministry of Water Resources approved the water and soil conservation plan report for Manlailiang Mine and 12bet casino Preparation Plant with Water Guarantee Letter [2010] No. 307,The 12bet casino mine adopts underground 12bet casino mining method,Designed production capacity 1.8 million tons/year,Completed and put into production in August 2014。April 2015,The Ministry of Water Resources passed the completion acceptance of the water and soil conservation facilities of the Manlailiang 12bet casino Mine and 12bet casino Preparation Plant Project (1.8 million tons/year mine part) (Water Guarantee Letter [2015] No. 574)。November 2018,Meihanzi [2018] No. 143 of the 12bet casino Industry Bureau of Inner Mongolia Autonomous Region approved an increase in 12bet casino mine production capacity from 1.8 million tons/year to 3.6 million tons/year。April 2008,The Ministry of Land and Resources demarcated the scope of the mineral fields by 12 inflection points in Document No. 025 [2008] of the Ministry of Land and Resources,Area 19.1847 square kilometers,As of the end of 2018,Ore resource reserves 135.45 megatons,Based on 3.6 million tons/year production capacity,Service years is 19.04 years。

Manlailiang 12bet casino Mine production capacity increased from 1.8 million tons/year to 3.6 million tons/year,New ground facilities including wind shaft site、Grouting floor mixing station、Deep water treatment workshop、Reservoir Project,Except for deep water treatment workshops, existing industrial sites are reserved (0.07 hectares) outside,The rest of the project construction is newly added land。Total land area 31.28 hectares (including existing facilities 25.55 hectares、This new area is 5.73 hectares)。The construction of the emergency reservoir was completed from August to October 2015;Rainwater tank project、Wind well site、The ground mixing station started construction in June 2019,Planned to be completed in June 2020。The total amount of earth and stone to be excavated and filled for new construction projects is 19.030,000 cubic meters,Total investment 21.56 million yuan。Using 12bet casino gangue as fuel in Mengtai Thermal Power Plant during production。

The unified social credit code/registration number of Mongolia Mengtai Manlailiang 12bet casino Co., Ltd. is 91150627585186321C,Enterprise legal person Zhang Guiqiang,The company is currently open for business。

The business scope of Inner Mongolia Mengtai Manlailiang 12bet casino Industry Co., Ltd. is: Licensed business items: None General business items: 12bet casino production and sales、Mining mechanical and electrical product sales。(Projects subject to approval according to law,Business activities can only be carried out after approval by relevant departments。) (Projects subject to approval according to law,Business activities can only be carried out after approval by relevant departments)。Inner Mongolia Autonomous Region,The total registered capital of companies with similar business scope is 1.036 million yuan,The main capital is concentrated in enterprises with a scale of more than 50 million,9 in total。Within this province,The current registered capital of the company is excellent。


>js_replace_0<