Huneng Group conducts special electronic trading of thermal 12bet casino 1. Trading time February 21, 2022 2. Trading qualifications Any enterprise with 12bet casino sales qualifications can sign up to participate in procurement transactions 3. Transaction Rules Arrange in the order of the final random draw IV. 12bet casino quality standards February 2021 Procurement Plan Purchasing Unit | 12bet casino type | Low heat generation (Kcal/kg) | Total water (%) | Ash content (%) | Total sulfur (%) | Particle size (mm) | Ash melting point (℃) | Power plant | Thermal 12bet casino | 4500 | ≤10 | <40 | 1.6 | 0-50 | ≥1200 |
Huneng Group purchases 12bet casino and trades 12bet casino types Purchase price and purchase volume in February 2022 Bid section | Delivery location | 12bet casino type | Block price (yuan/ton) | Minimum reporting quantity (10,000 tons) | Maximum reporting volume (10,000 tons) | Purchase quantity (10,000 tons) | Power plant bidding section | Power plant 12bet casino yard | Thermal 12bet casino | 536 | ≥1 | ≤1 | 1 |
Remarks: Delivery method is factory delivery。 (1) The daily 12bet casino supply shall be based on the actual demand of the power plant. You can sign a supplementary contract to adjust the price (3) Traders need to pay margin Traders need to pay the margin before 9:00 on February 21, 2022 Power plant account information: Unit name: Ordos Huneng 12bet casino Group Co., Ltd. Power Plant Account opening bank: Bank of China Ordos Branch Sales Department Account number: 149205382531 For details on the cash rate assessment method, please see the contract template (5) For details on the deposit, please refer to the Margin Management Measures for Fuel Online Bidding and Procurement of Ordos Huneng 12bet casino Group Co., Ltd. (6) Suppliers who continue to participate in the bidding can also use an equal amount of the unpaid 12bet casino payment as a deposit The negotiating supplier must submit a supply confirmation letter and pay the transaction service fee before 17:00 on February 21 (transaction service fee = negotiated quantity × 0 The winning supplier must pay the transaction service fee before 17:00 on February 21 (transaction service fee = transaction quantity × 0 (9) Transaction service fee payment account information: Account opening unit: Ordos 12bet casino Network Co., Ltd. Account name: China Construction Bank Co., Ltd. Ordos Wenming Road Branch Account number: 15050110223100000003 When paying the service fee, please note the 12bet casino type and quantity. (10) If one of the following circumstances occurs after the transaction, the entire performance bond will be deducted (performance bond amount = transaction quantity × transaction price × 5% 1. The dealer chooses to abandon the bid. 2. The trader failed to pay the transaction service fee within the prescribed time. Failure to supply electricity and 12bet casino according to the power generation enterprise’s transportation requirements for 5 consecutive days during the loose supply period or 3 consecutive days during the tight supply period Deduct 5% of the total contract amount from the final 12bet casino settlement amount (maximum 300,000 yuan for a single contract) (12) Deposit collected by the power plant (13) Deposit after winning the bid or successfully negotiating the bid 7. Others Subject to the final processing result of the legal department Contract performance period: thermal 12bet casino from February 2022Until 24:00 on March 22, 2022 Nine、The right to interpret this announcement belongs toOrdos Huneng 12bet casino Group Co., Ltd.。 |